Sunday, 28 December 2014

Summer Terrace - Day 4 and 5 - plumbing

The start of reconstruction! Hooray!

With winter quickly approaching, it's time to get a new boiler installed, and get the heating on.  It was installed in the same position as the previous (old) one so not too much mess or trauma.


And just in time because the snow has just started falling. 

At the same time, the plumbers made a start on the first fix for the rest of the plumbing - including the new ensuite on the top floor.

Meanwhile.....I'm still stripping wallpaper and scraping artex off walls. The only silver lining to this is that it saves me labour costs and gym membership costs!!


Not many photos, far too busy up a ladder stripping wallpaper, plus I'm sure you can imagine what a radiator looks like.



No comments:

Post a Comment

Note: only a member of this blog may post a comment.